 
| Autumn 2014 | |
|  Track and path maintenance. |  Newly-dug trackside ditch. | 
|  The completed boardwalk. | |
|  The boardwalk under construction over a boggy area using Sallerton Wood Chestnut. |  Charring the boardwalk stakes to deter decay. | 
|  Woodland Shelter. |  Lunch time in the woodland shelter. |